Danetree appeal documents

The documents listed below are those submitted to WNDC in June and October 2008 relating to the appeal against the proposed Danetree site.

 

Core document reference 5.18 ES Reg 19 response Part 1 below

Covering Letter

Stage 1 - Response to request for 'further information' under regulation 19 of the environmental impact assessment regulations (1999) as amended

Stage 1 - Response providing supplementary information to address identified 'areas of clarification' in respect of the Danetree village environmental statement

 

Core document reference 5.19 ES Reg 19 response Part 2 below

Covering Letter 13/10

Design and Access Statement Part 1

Design and Access Statement Part 2

Design and Access Statement Part 3

Design and Access Statement Part 4

Design and Access Statement Part 5

Design and Access Statement Part 6

Design and Access Statement Part 7

Design and Access Statement Part 8

Design and Access Statement Part 9

Design and Access Statement Part 10

Non Technical Summary

Supplementary Transport Assessment

Technical Studies -

Chapter A

Chapter B

Chapter C

Chapter D

Chapter E

Chapter F

Chapter G

Chapter H

Chapter I

Chapter J

Chapter K

Chapter L

Appendices to Technical Studies -

Appendices Contents Page

A1 regulation 19 request

A2 entec

A2 eversheads

A3 composit parameters plan

A3 density and height matrix

A3 development framework

A3 green infrastructure

A3 infrastructure matrix

A3 land use matrix

A3 phasing plan

B1 agricultural land

C1 archiology

D1 supplementary transport assessment

D2 2008 baseline traffic data 

D3 extent of baseline coverage

D4 existing road network

E1 & E2 noise and vibration

F1 floodrisk assessment

G1 phase 1 geo-environmental assessment

G2 stage 1 hydrogeological assessment Part 1

G2 stage 1 hydrogeological assessment Part 2

H1-H7 air quality

H8 annual average PM10 concentrations

H9 air quality figures

I1 site boundaries and ZVI's

I2 photograph view points

I3 photo sheet

J1 ecological surveys

J2 bat surveys 2008

J3 invertebrate site assesssment

J4 green infrastructure: ecology

J5 potential local wildlife site assessment

J6 ecological management plan

J7 ecological survey

J8 green infrastructure opportunities

J9 references and bibliography

K1 notes of water supply and waste water issues meeting 28/08

L1 estimated employment generation