The documents listed below are those submitted to WNDC in June and October 2008 relating to the appeal against the proposed Danetree site.
Core document reference 5.18 ES Reg 19 response Part 1 below Covering Letter
Stage 1 - Response to request for 'further information' under regulation 19 of the environmental impact assessment regulations (1999) as amended
Stage 1 - Response providing supplementary information to address identified 'areas of clarification' in respect of the Danetree village environmental statement
Core document reference 5.19 ES Reg 19 response Part 2 below
Covering Letter 13/10
Design and Access Statement Part 1
Design and Access Statement Part 2
Design and Access Statement Part 3
Design and Access Statement Part 4
Design and Access Statement Part 5
Design and Access Statement Part 6
Design and Access Statement Part 7
Design and Access Statement Part 8
Design and Access Statement Part 9
Design and Access Statement Part 10
Non Technical Summary
Supplementary Transport Assessment
Technical Studies -
Chapter A
Chapter B
Chapter C
Chapter D
Chapter E
Chapter F
Chapter G
Chapter H
Chapter I
Chapter J
Chapter K
Chapter L
Appendices to Technical Studies -
Appendices Contents Page
A1 regulation 19 request
A2 entec
A2 eversheads
A3 composit parameters plan
A3 density and height matrix
A3 development framework
A3 green infrastructure
A3 infrastructure matrix
A3 land use matrix
A3 phasing plan
B1 agricultural land
C1 archiology
D1 supplementary transport assessment
D2 2008 baseline traffic data
D3 extent of baseline coverage
D4 existing road network
E1 & E2 noise and vibration
F1 floodrisk assessment
G1 phase 1 geo-environmental assessment
G2 stage 1 hydrogeological assessment Part 1
G2 stage 1 hydrogeological assessment Part 2
H1-H7 air quality
H8 annual average PM10 concentrations
H9 air quality figures
I1 site boundaries and ZVI's
I2 photograph view points
I3 photo sheet
J1 ecological surveys
J2 bat surveys 2008
J3 invertebrate site assesssment
J4 green infrastructure: ecology
J5 potential local wildlife site assessment
J6 ecological management plan
J7 ecological survey
J8 green infrastructure opportunities
J9 references and bibliography
K1 notes of water supply and waste water issues meeting 28/08
L1 estimated employment generation