The documents listed below are those submitted to WNDC in November 2008 relating to the appeal against the proposed Church Fields site.
Design and Access Statement
DAS 1 - Preface
DAS 1 - Introduction
DAS 2 - Assessment of context
DAS 3 - Involvement
DAS 4A - Masterplan and description
DAS 4B - Masterplan and description
DAS 5 - Phasing and implementation
DAS 6 - Scale and Parameters Plan
DAS 7 - Application Master Plan
Environmental Statement Addendum
ESA Contents, Preface and Chapter 1
ESA Chapter 4 The Proposed Development
ESA Chapter 5 Planning and Policy Context
ESA Chapter 6 Landscape and Visual Impact
ESA Chapter 7 Ecology and Nature Conservation
ESA Chapter 8 Water, Quality, Drainage and Hydrology
ESA Chapter 9 Archaeology and Cultural Heritage
ESA Chapter 10 Soils, Land Contamination and Agriculture
ESA Chapter 11 Social and Economic Effects
ESA Chapter 16 Sustainability
Figures
4.1 Application Master Plan
4.4 Scale and Parameters Plan
4.5 Density Plan
4.6 Building Heights
4.7 Access and Movement Plan
4.8 Green Infrastructure Plan
4.9 Phasing Plan
6.6 Zone of Visual Influence and Viewpoint Plan
6.12 Impact of Realigned B4036 on Topography
6.13 Landscape Mitigation Measures
6.14 Zone of Visual Influence: Cumulative Effects of Church Fields, Danetree and Monksmoor Developments
7.2a Extended Phase 1 Habitat Survey: Development Site
7.2b Extended Phase 1 Habitat Survey: Off-site Mitigation Area E
7.3a Assessment of Hedgerows Ecological Value: Development Site
7.3a Assessment of Hedgerows Ecological Value: Off-site Mitigation Area E
7.5 Location of Important Species of Breeding Farmland Birds
7.6 Ecological Constraints Plan
7.7 Ecological Mitigation Plan
7.8 Great Crested Newt Mitigation Measures
7.9 Impacts of Hedgerows
9.2 Extent of Geophysical Survey
Appendices
ESA Appendices Contents
7.14A Daventry Canal Arm - Ecological Field Survey Report: Invertebrates
7.14B Daventry Canal Arm - Ecological Field Survey Report: Reptiles
7.14C Daventry Canal Arm Stage 2 bat survey of the trees, on land around Daventry Reservoir
7.14D Daventry Canal Arm - Ecological Field Survey Report: Dormouse
7.14E Daventry Canal Arm - Ecological Field Survey Report: Otter and Water Vole
7.14F Daventry Canal Arm - Ecological Field Survey Report: Breeding Birds
7.14G Daventry Canal Arm - Ecological Field Survey Report: Wintering Birds
7.15 and 7.16 Ecology Survey Update 2007 and Extended Phase 1 Habitat Survey 2007
7.17 Hedgerow Survey 2008
7.18 Amphibian Survey 2008
7.19 Bat Survey 2008
7.20 Brown Hare Survey 2008
7.21 Dormouse Survey Report (2004)
7.22 Winter Bird Survey and Desk Study 2008
7.23 Breeding Bird Survey 2008
7.24 Barn Owl Survey 2008
9.4 Geophysical Survey Report 2008
9.4 Geophysical Survey Report Figures 1 - 8
Regulation 19 Response, Environmental Statement: Environmental Impact Assessment Stage 1
Regulation 19 Response Stage 1 Main Report
Table 4 Magnitude of Change for the Major Links
Table 6 Significance of Effect on Each Receptor
Figures 1 - 7
Appendix 1 WNDC EIA Regulation 19 Request for Further Information
Appendix 2 Geophysical Survey Report 2008
Appendix 2 Geophysical Survey Report Figure 1 - 8
Appendix 3 Daventry Transport Study Figure 6.1: Summary of Option 4 Junction and Link Improvements Road