Please note that the dates in brackets are relating to the date on which the document was published.
HA 1 - Transportation and Highways Round Table Position Statement (9th January 2009)
HA 2 - Preliminary Opening Statement (20th January 2009)
HA 3 - Modelling Note - Junction Modelling (10th February 2009)
HA 4 - Modelling Note - Flore / Weeden Bypass (10th February 2009)
HA 5 - Flore/Weedon Bypass Feasibility Technical Note (1st April 2009)
HA 5.1 - Plan to Accompany HA 5 - Junction 5A Traffic Signals Controlled Junction Option 1 (1st April 2009)
HA 5.2 - Plan to Accompany HA 5 - Junction 5A Dumb-Bell Roundabout Option (1st April 2009)
HA 5.3 - Plan to Accompany HA 5 - M1 Junction 16 Flore/Weedon Bypass Minimum Impedance Buffer Test Junction Mitigation (1st April 2009)
HA 6.1 - Victoria Bennett Proof of Evidence - Highways and Transportation (22nd April 2009)
HA 6.2 - Victoria Bennett Summary Proof of Evidence - Highways and Transportation (22nd April 2009)
HA 6.3 - Victoria Bennett Appendices to Proof of Evidence - Highways and Transportation (22nd April 2009)
HA 7.1 - Ian Braddock Proof of Evidence - Highways and Transportation (22nd April 2009)
HA 7.2 - Ian Braddock Summary Proof of Evidence - Highways and Transportation (22nd April 2009)
HA 7.3 - Ian Braddock Appendices to Proof of Evidence Volume 1 - Highways and Transportation (22nd April 2009)
HA 7.4 - Ian Braddock Appendices to Proof of Evidence Volume 2 - Highways and Transportation (22nd April 2009)
HA 8 - Victoria Bennett Rebuttal Proof of Evidence - Highways and Transportation (22nd May 2009)
HA 9 - Ian Braddock Rebuttal Proof of Evidence - Highways and Transportation (22nd May 2009)
HA 10 - Ian Braddock Supplementary Rebuttal Proof of Evidence & Appendices - Highways and Transportation (19th June 2009)
HA 11 - Highways Observations on Conditions and Legal Obligations (19th June 2009)
HA 11/1 - Highways Observations on Conditions and Legal Obligations - Update (15th July 2009)
HA 12 - Outline Opening Highway Submissions (25th June 2009)
HA 13 - Highways Agencies derivation of the number of housing completions that could be accommodated by the Interim A5/A45 Scheme identified by SBA (29th June 2009)
HA 14 - Supplementary information provided by Ian Braddock following his Appearance (29th June 2009)
HA 15 - Draft Conditions - Scenarios (15th July 2009)
HA 16 - Closing Submissions (23rd July 2009)
HA 17 - HA Response to Monksmoor Costs Application (23rd July 2009)